Project Information
Location Karratha, Western Australia
Client Arcadis
Engineers Arcadis
Budget Confidential
Program September 2014
Size 12MW
Role Estimating Support
Highgate Management were appointed by Hyder Consulting (Arcadis) to provide detailed estimates and Bills of Quantities for Electrical, Pipelines, Tanks, Roads and Crossings for the Karratha Effluent Reuse scheme.
KEY FEATURES
- Challenging programme
- Brownfield Environment
KEY ACHIEVEMENTS
- Developed estimates and BOQ’s in stages as information became available.
- Worked closely with the engineering team to ensure the costs were reflective of the scope at each stage.
- Provided advice on the local market conditions and the changing factors that would impact on the capital cost outlay for construction.