Project Information
LocationVictoria, Australia
Client:Rail Transformation Consortium
EngineersRTC
BudgetConfidential
ProgramDecember 2014
Size% Capacity Increase
RoleDRC Independent Estimate
The team were engaged by the Rail Transformation Consortium to provide an Independent Estimate costing for the DRC Modifications Package. In developing the estimate the authors have used direct cost knowledge, historical information and first principles methodologies in combination in determining the final estimate outcome.
KEY FEATURES
- 2.7km Duplication
- Junction refurbishment/li>
- Multinational team
- Signal Changes
- Overhead Lines
KEY ACHIEVEMENTS
- Worked to a demanding programme to produce an Independent Estimate that accurately reflected the Scope of Works.
- Worked closely with the RTC team to absorb the engineering information.
- Provided an Independent Estimate autonomously that on completion verified the internal estimates that had been previously produced.