Dandenong Rail Corridor (DRC) modifications

Project InformationRTC logo

LocationVictoria, Australia

Client:Rail Transformation Consortium

EngineersRTC

BudgetConfidential

ProgramDecember 2014

Size% Capacity Increase

RoleDRC Independent Estimate

The team were engaged by the Rail Transformation Consortium to provide an Independent Estimate costing for the DRC Modifications Package. In developing the estimate the authors have used direct cost knowledge, historical information and first principles methodologies in combination in determining the final estimate outcome.

Dandenong Rail Corridor

KEY FEATURES

  • 2.7km Duplication
  • Junction refurbishment/li>
  • Multinational team
  • Signal Changes
  • Overhead Lines

KEY ACHIEVEMENTS

  • Worked to a demanding programme to produce an Independent Estimate that accurately reflected the Scope of Works.
  • Worked closely with the RTC team to absorb the engineering information.
  • Provided an Independent Estimate autonomously that on completion verified the internal estimates that had been previously produced.